homeemailcontact us
TAIPAN2
PROPERTY OVERVIEW


Indamount Development Sdn Bhd

BUSINESS GATEWAY TO ARA DAMANSARA (Petaling Jaya)
Select the most suitable investment portfolio to bring you a solid long-term return from Petaling Jaya’s hit location - Ara Damansara’s new commercial centre, TAIPAN DAMANSARA 2. It is about wagering on a sure proven winner before other realize its full potential.


The 3½ Storey Shop Office With Private Carparks


SPECIFICATION

SHOP (Ground Floor)
Structure: Reinforced concrete framework 
wall: Bricks 
Roofing: Metal sheet roofing 
Ceiling: Skim coat R.C Slab 
Doors: Shopfront- Metal roller shutter
 : Toilets- Plywood flush door
Window: Shoprear- Aluminium Framed casement windows
 : Toilets- Fixed glass louvres
Floor Finishes: Toilets- Ceramic tiles
 : Others- Cement render
 : Staircase (LG-G)- Cement render
Wall Finishes: External- Cement plaster with paint
 : Internal- Cement plaster with paint
 : Toilets- 1500mm high wall tiles,
Ironmongery: Selected lockests 
Sanitary Fittings: Sitting W.C- 1 no
 : Squatting W.C- 1 no
 : Wash basin- 1 no
Power Supply: 3 Phase wiring with 60 Amps 
Electrical Fittings: Intermediate 
 : Light Points- 8 nos.
 : Power point- 4 nos.
 : Fan points- 2 nos.


OFFICE (1st and 2st Floor)
Structure: Reinforced concrete framework 
wall: Bricks 
Ceiling: 1st Floors- Skim coat R.C slab
 : 2nd Floors- Asbestos-free ceiling
Doors: plywood flush door 
 : 1 hour fire door 
Window: Aluminum framed casement windows 
Floor Finishes: Cement render 
 : Staircase (G-2nd)- Ceramic tiles
Wall Finishes: External- Cement plaster with paint
 : Internal- Cement plaster with paint
 : Toilets- 1500mm high wall tiles,plaster & paint
Ironmongery: Selected lockests 
Sanitary Fittings: Sitting W.C- 1 no
(Every floor): Wash basin- 1 no
 : Squatting W.C- 1 no
Power Supply: 3 Phase wiring with 60 Amps 
Electrical Fittings: Intermediate 
(Every floor): Light Points- 7 nos.
 : Power points- 6 nos.
 : Air-cond points- 2 nos.


CARPARK (Lower Ground Floor)
Structure: Reinforced concrete framework 
wall: Bricks 
Ceiling: Skim coat R.C slab 
Floor Finishes: Cement render 
Wall Finishes: Cement plaster with paint 
Electrical Fittings: Light Points- 4 nos.
 : Power points- 1 nos.


SITE PLAN
LBI CAPITAL BERHAD
LBI CAPITAL BERHAD
(41412 -X)
Copyright©2012 LBI Capital Berhad. All right reserved.Site by 360 Interactive